What works are taking place?

We will be carrying out surface dressing works on Hooks Beech, Whatlingon betwen A21 and Park Lane.

Work will involve spraying bitumen binder onto a dry road surface. We then spread stone chippings and roll the surface to embed the stones.

Following works, advisory 20mph speed limits are put in place. This is to protect road users from loose chippings.

This type of work provides a safer, non-skid road surface. It also seals and waterproofs the road, extending the life of the road by 10 years.

Further Information

Prior to the surface dressing works we need to remove road studs. This work will take place on Monday 18 July for one day between 8am and 5pm. During this time, this section of Hooks Beech will be closed.

The surface dressing works will take place on Saturday 30 July for one day between 8am and 5pm. During this time, this section of Hooks Beech will be closed.

After the surface dressing, we will need to return to reinstall the road studs. This work will take place on 15 September for one night between 7pm and 6am.

Traffic will be diverted via A21, B2244, B2165, B2089 and vice versa

We will always allow access for emergency vehicles. Pedestrian access will be maintained.

Dates may be subject to change. We will keep you updated with any changes via the signs on site and our website.

We will be carrying out works to reinstall road studs on Hooks Beech, Whatlington. We will also be taking this opportunity to install a berm and adjust the drainage gully outside Vinehall Manor. Work will take place on Monday 28 November between 8pm and 6am. During this time, Hooks Beech will be closed between Vinehall Road and Park Lane. We are carrying out the works in collaboration with National Highways during their closure of the A21.

Information for local people

We will sweep the road after 24 hours, 3 days and again one week after the new surface has been laid.

We will replace any road markings after the final sweep. This can be one to three weeks after the works. If parked cars are in the way then there may be further delays so please do not park here following works. There will be ‘no parking’ signs and cones on site to advise where parking is restricted.

Feedback: Let us know how we did by leaving us feedback.